Belsenpark
Düsseldorf
- Phases: Appraisal, Preliminary design, Design development, Planning approval, Technical planning
- Planning time: 2011
- Gross Floor Area: 9763 m2
- Gross Volume: 33100 m3
- Building contractor: Patrizia Projektentwicklung GmbH Augsburg
DGNB-pre-certificate silver
In the Düsseldorf district of Oberkassel a modern quarter with 40 high-quality owned apartments up to 212 m² in size including underground car park with 70 parking spaces is being built on the area of the former freight yard. A U-shaped structure expands to the park and comprises the inner courtyard. The ensemble is completed with a solitaire at the south-west corner and is characterised by succint lines that relate its tension from the contrast between straight edges and rounded forms. The facade is made of high-quality materials - full clinker strips, wood-aluminium windows and plaster frames.
Project manager: Hanspeter Müller, Uwe Ritter
Team: Anke Klauser, Dominik Schnabel, Nina Hartmann, Stefan Meiners, Sanvila Samurovic, Vera Schlepkow