Office Building Quellenpark

Projects, Architecture, Office,
Bad Vilbel
  • Phases: 1 - 4
  • Planning time: 2022 - 2023
  • Building contractor: CESA Investment GmbH & Co. KG

The new office building is to be constructed as the first project in the reworked SpringPark Valley District in Bad Vilbel, the planning of which is based on the urban concept designed by planquadrat. The new five-storey office building with penthouse level forms the south-eastern entrance to the district and faces the centre of the district. Horizontally structured, the upper floors are staggered in a moving form over the slightly recessed ground floor so that they appear to hover above the ground floor. On the ground floor there is a cafe planned with outdoor dining, as well as conference areas for office use and a spacious foyer with a prestigious staircase. Planned for the upper floors are flexible open space offices and individual offices and on the top floor there will be facilities for events. The underground car park can be accessed by the side facing away from the district.

Team: Robert Müller, Fritz Heinrichs, Lutz Müller, Frauke Bimberg, Laila Hodroj, Miriam Veith, Laurentius Ivan, Karsten Bauschert